Projects - Soil/Contaminated sites

 

Gasworks / Military Sites

Project Year Media Applied Techniques
Contaminants Characteristics
pdf.gif Elsnig (Germany) 2005-2006 Soil Recovery of Ammunition, Tent Cover, Treatment in STC, Waste Air Treatment PAH, Ammunition, Explosive Residues 3,000 to
Frankfurt (Germany) 2005 Soil Bored Pile Wall, Dewatering, Tent Cover, Soil Exchange, Treatment in STC, Excavation Water and Waste Air Treatment BTEX, PAH, Phenols, Heavy Metals, Construction Debris, Ammonia, Cyanide 40,000 to
Bad Kreuznach (Rhineland-Palatinate, Germany) 2004 Soil Conversion, Demolition, Excavation, Disposal TPH, BTEX, PAH 120,000 m³ Excavation, Disposal 6,000 to Construction Debris and 100,000 to Soil
Sembach (Baden-Wuerttemberg, Germany) 2002 - 2003 Soil Top-Turn, On-Site-Remediation TPH, BTEX 10.000 m² Remediation Area
pdf.gifGifhorn(Germany) 2004 Soil, Excavation Water Excavation, Replacement Borings, Disposal, Sedimentation, Activated Carbon, Cyanide Adsorption PAH, Cyanide former Gasworks Site, app. 18,000 to Soil
pdf.gifCrimmitschau (Saxony, Germany) 2002 Soil, Excavation Water Excavation, Sump Drainage PAH, Cyanide former Gasworks Site
Halle (Germany) 2004 Soil, Tar Pit Sheet Pile Wall, Excavation PAH, TPH 2,000 to Tar

 

Industrial Sites / Nuclear Sites 

Project Year Media Applied Techniques
Contaminats Characteristics
Freiburg i. Br. (Germany) 2005 Soil 4.500 m³ conventional excavation, 1.000 m³ Soil exchange CHC, PAK, MKW  
Großheringen (Germany) 2006 Soil, Exc. Water Sheet Pile Wall, Bored Pile Wall, Dewatering, Soil Exchange, Disposal, Treatment in STC, Excavation Water Treatment TPH, Heavy Metals 9,000 to
pdf.gifKonstein(Germany) 2005 Soil Dismantling, Mechanical Treatment, Drainage Trenches, Surface Cover System, Landfill Construction, Disposal TPH, PAH, As, Pb, Asbestos, Construction Debris, AMF, Dust 62,000 m³ Converted Space
pdf.gifSegnitz(Germany) 2005 Soil, Exc. Water Dewatering, Replacement Borings: Depth to 20 m, Cut-Off Wall, Shipping, Excavation Water Treatment As, Cu, Pb, Suspended Particles 70,000 to
Premnitz (Germany) 2006 Soil, Exc. Water Dismantling, Sub-Surface Clearance, Tent Cover, Replacement Borings, Excavation Water and Waste Air Treatment Alkyl-Lead, Construction Debris  
Leuna, Old Refinery (Germany) 2006 Soil, Exc. Water, Soil Vapour Sub-Surface Clearance, Mechanical Treatment, Dewatering, Treatment in STC, Excavation Water and Soil Vapour Treatment BTEX, TPH, PAH 460,000 to
pdf.gifPottenstein (Bavaria, Germany) 2005 Construction Debris Demolition, Disposal PAH, Heavy Metal containing Paint, Asbestos, artifical Mineral Fibre (AMF) app. 14.000 m³ Demolition
pdf.gifBergrheinfeld (Bavaria, Germany) 2004 Soil, Excavation Water Excavation, Replacement Borings, Disposal, Excavation Water, Tent Cover with
Off-Gas Treatment
PAH 113,000 to Soil, 30.000 to disposed by train, 300 to Construction Debris
pdf.gifBiebesheim (Bayern, Germany) 2003 Soil, Excavation Water Soil, Excavation Water Tetraethyl-, Tetramethyl Lead, TPH 300 m² Area, 12 m deep Contamination, 4,500 to Soil
Koenigsee (Thuringia, Germany) 2004-2005 Soil, Construction Debris, Excavation Water Brownfield Restoration, Excavation, Dismantling, Disposal, Excavation Water TPH, Chrome, Lead 25,000 m² Area, 65,000 to Soil, 20,000 to Construction Debris
pdf.gifLeuna (Saxony-Anhalt, Germany) 2005 Soil, Construction Debris, Excavation Water, Off-Gas Tent Cover with Off Gas Treatment, Excavation, Disposal, Sheet Pile Wall, Phase Separation, Counter Flow Scrubber, Activated Carbon Adsorption Softener, TPH, Phenol, Paraffin, aromatic HC, Ether Off Gas Treatment 90.000 m³/h, 53.000 to Soil, 500 to Construction Debris
pdf.gifKahl (Germany) 2005 Construction Debris, Concrete Dismantling of a Research Reactor AMF, Suspended Particles Concrete Cutting, Special Static Requirements
pdf.gifNukem, Hanau (Germany) since 2003 Soil, Excavation Water Excavation, Replacement Borings radioactive Contamination 10,000 to Soil
pdf.gifPirna (Saxony, Germany) 2004 Soil, Construction Debris, Excavation Water Dismantling, Demolition, Excavation, Disposal TPH, PAH, Phenols, Construction Debris 73,000 to Soil, 3,000 to Construction Debris disposed in Soil Treatment Centre Hirschfeld
pdf.gifGliwice, Poland 2005 Soil, Soil Vapour Soil Exchange, in situ: Aeration, Nutrient Supply, Activated Carbon Filter TPH Four Remediation Sites

 

Landfill Sites

Project Year Media Applied Techniques
Contaminants Characteristics
pdf.gifArlesried (Bavaria, Germany) 2003 Residuals of bore rinsing Excavation, Disposal PAH, TPH 35,000 to
pdf.gifLangelsheim (Lower Saxony, Germany) 2003 Soil Mixed In Place, Sealing Wall, Landfill Sealing liner system Zinc, Cadmium, Lead, Copper, Nickel 415 m long, 12 m deep Sealing Wall

 

Funnel and Gate / Reactive Barriers / Drainage

Project Year Media Applied Techniques
Contaminants Characteristics
Asperg (Baden-Wuerttemberg, Germany) 2003 GW, Drainage Drainage    
Geretsried (Bavaria, Germany) 2004 GW, Drainag Drainage    
pdf.gifMunich (Germany) since 2004 GW Funnel & Gate Gaswork Site Remediation 1.2 km Funnel, Duration 50 Years